0

packaged enterprise solutions Online Quiz - 9

Description: packaged enterprise solutions Online Quiz - 9
Number of Questions: 20
Created by:
Tags: packaged enterprise solutions
Attempted 0/20 Correct 0 Score 0

A Sales order can be imported from other sources.

  1. True

  2. False


Correct Option: B

Price list Contains

  1. Unit Price of the item

  2. Formula

  3. Currency

  4. All of the above


Correct Option: D

What are the pre-requisites for Routing define

  1. Item Creation

  2. Operations

  3. Department

  4. All the above


Correct Option: D

Oracle WIP , consider Substitute items in pick list

  1. True

  2. False


Correct Option: B

You must define Primary bill or routing before you can define an alternate

  1. NO

  2. YES

  3. Alternate Bill or routing can be created by copy method

  4. Import source method we can


Correct Option: B

Comparing of two bills to identify similarities and differences between them through

  1. Indented BOM

  2. Alternate BOM

  3. CTO

  4. ATO


Correct Option: A

Where do you setup substitute components

  1. In Substitute Components Window

  2. Bill Details Tab

  3. Revision

  4. None of the above


Correct Option: A

You can create a chain of references of Common Bill

  1. True

  2. False


Correct Option: B

You can use Oracle Bills of Material (BOM) to do the following:

  1. Create and maintain production items

  2. Create and maintain production bills of materials

  3. Create and maintain production resources, departments, routings and lead times

  4. All the above


Correct Option: D

Explain the Maximum number of levels defined in BOM

  1. 60

  2. 64

  3. 66

  4. 70


Correct Option: A

Config BOM Creation Allowed Check Box is selected in BOM Parameters for

  1. OM validation organization that is not a manufacturing organization can be set to No

  2. you plan to manufacture or purchase your configurations

  3. It can be set to No in other organizations where a model BOM exists,but a config BOM is not necessary

  4. All the above


Correct Option: D

Which of the following will not has reference designators

  1. Planning bills and Model

  2. Planning components

  3. Option class

  4. None of the above


Correct Option: D

How do you check BOM circular loops

  1. While creation of BOM Application throws error of items duplidation in levels

  2. While running cost update program

  3. Check for loops program

  4. None of the above


Correct Option: C

It is not possible to have custom deletion constraints

  1. True

  2. False


Correct Option: B

Deletion Constraints are

  1. BOM

  2. Routing

  3. Components and Operations

  4. All the above


Correct Option: D

BOM workday Calendar which of the following weekly pattern

  1. 4/4/5

  2. 5/4/4

  3. Both Option 1 and 2

  4. 4/4/4


Correct Option: C

Resources types in BOM Departments

  1. PERSON

  2. MACHINE

  3. CURRENCY

  4. All the above


Correct Option: D

While defining Department Instances refers to

  1. No.of resources identified to that particular resource group

  2. No of Operations defined in that department

  3. No of routing in that department

  4. None of the above


Correct Option: A

You cannot enable 24 Hrs available check box while defining Resources in Departments of Oracle Bills of material

  1. Shifts are enabled you cannot

  2. Shifts are not enabled you cannot

  3. Instances are enbaled

  4. UOM is not enabled


Correct Option: A

Whats the difference between standard operations and operations

  1. Similar operations are standard operation can be used by other routing and unique operations particulary to that item/assembly called operations

  2. Similar operations are standard operation cannot be used by other routing and unique operations particulary to that item/assembly called operations

  3. Both Option 1 and 2

  4. None of the above


Correct Option: A
- Hide questions