IBM Datastage Quiz

Description: IBM Datastage Quiz
Number of Questions: 8
Created by:
Tags: datastage
Attempted 0/8 Correct 0 Score 0

It is the internal scripting language of DataStage Engine.

  1. Shell Script

  2. OSH

  3. Scriptella

  4. All the above


Correct Option: B

AI Explanation

To answer this question, you need to understand the internal scripting language of the DataStage Engine.

Option A) Shell Script - This option is incorrect because Shell Script is not the internal scripting language of the DataStage Engine. Shell Script is a scripting language commonly used for automating tasks in Unix-based operating systems.

Option B) OSH - This option is correct. OSH (Orchestrate Shell) is the internal scripting language of the DataStage Engine. It is used to define and control the execution of DataStage jobs and perform various data integration tasks.

Option C) Scriptella - This option is incorrect. Scriptella is an open-source ETL (Extract, Transform, Load) and script execution framework, but it is not the internal scripting language of the DataStage Engine.

Option D) All the above - This option is incorrect because only option B (OSH) is the correct internal scripting language of the DataStage Engine.

The correct answer is B) OSH. This option is correct because OSH is the internal scripting language specifically designed for the DataStage Engine.

  1. UNIX

  2. LINUX

  3. WINDOWS

  4. ALL THE ABOVE


Correct Option: C

How to run the dsjob in command prompt ?

  1. run dsjob

  2. $dsjob -run

  3. dsjob run

  4. $run -dsjob


Correct Option: B

What is the maximum number of nodes that can be configured in Datastage 8.5 ?

  1. 10

  2. 6

  3. 8

  4. infinity


Correct Option: C
Explanation:

To solve this question, the user needs to have knowledge of Datastage 8.5 and the concept of nodes in Datastage.

In Datastage 8.5, the maximum number of nodes that can be configured depends on the edition of Datastage. The user needs to know that the correct answer will be the maximum number of nodes that can be configured in Datastage 8.5.

Now, let's go through each option and explain why it is right or wrong:

A. 10: This option is incorrect because Datastage 8.5 does not support a maximum of 10 nodes. The maximum number of nodes that can be configured in Datastage 8.5 is less than 10.

B. 6: This option is incorrect because Datastage 8.5 does not support a maximum of 6 nodes. The maximum number of nodes that can be configured in Datastage 8.5 is less than 6.

C. 8: This option is correct. In Datastage 8.5, the maximum number of nodes that can be configured is 8. This means that a Datastage 8.5 environment can have a maximum of 8 nodes.

D. infinity: This option is incorrect because Datastage 8.5 does not support an infinite number of nodes. There is a maximum limit to the number of nodes that can be configured in Datastage 8.5.

The Answer is: C. 8

- Hide questions