Construction and Demolition Waste Management Rules, 2016

Description: This quiz is designed to assess your understanding of the Construction and Demolition Waste Management Rules, 2016.
Number of Questions: 15
Created by:
Tags: environment waste management construction demolition
Attempted 0/15 Correct 0 Score 0

Which authority is responsible for enforcing the Construction and Demolition Waste Management Rules, 2016?

  1. Central Pollution Control Board

  2. State Pollution Control Boards

  3. Ministry of Environment, Forest and Climate Change

  4. All of the above


Correct Option: D
Explanation:

The Construction and Demolition Waste Management Rules, 2016 are enforced by the Central Pollution Control Board, State Pollution Control Boards, and the Ministry of Environment, Forest and Climate Change.

What is the definition of construction and demolition waste as per the rules?

  1. Waste generated during the construction, alteration, or demolition of any civil structure

  2. Waste generated during the excavation of earth or rock

  3. Waste generated during the processing of construction materials

  4. All of the above


Correct Option: D
Explanation:

Construction and demolition waste includes waste generated during the construction, alteration, or demolition of any civil structure, waste generated during the excavation of earth or rock, and waste generated during the processing of construction materials.

What are the responsibilities of the project proponent as per the rules?

  1. To prepare a waste management plan

  2. To obtain authorization from the concerned authority

  3. To ensure proper storage and disposal of waste

  4. All of the above


Correct Option: D
Explanation:

The project proponent is responsible for preparing a waste management plan, obtaining authorization from the concerned authority, and ensuring proper storage and disposal of waste.

What are the requirements for the storage of construction and demolition waste?

  1. Waste must be stored in designated areas

  2. Waste must be covered to prevent dust and odor

  3. Waste must be stored in a manner that does not pose a hazard to human health or the environment

  4. All of the above


Correct Option: D
Explanation:

Construction and demolition waste must be stored in designated areas, covered to prevent dust and odor, and stored in a manner that does not pose a hazard to human health or the environment.

What are the methods of disposal of construction and demolition waste as per the rules?

  1. Landfilling

  2. Incineration

  3. Recycling

  4. All of the above


Correct Option: D
Explanation:

Construction and demolition waste can be disposed of by landfilling, incineration, recycling, or a combination of these methods.

What are the responsibilities of the local authority as per the rules?

  1. To designate waste storage and disposal sites

  2. To monitor the implementation of the rules

  3. To take action against violators

  4. All of the above


Correct Option: D
Explanation:

The local authority is responsible for designating waste storage and disposal sites, monitoring the implementation of the rules, and taking action against violators.

What are the penalties for violation of the Construction and Demolition Waste Management Rules, 2016?

  1. Fine up to Rs. 1 lakh

  2. Imprisonment up to 5 years

  3. Both fine and imprisonment

  4. None of the above


Correct Option: C
Explanation:

Violation of the Construction and Demolition Waste Management Rules, 2016 can result in both fine up to Rs. 1 lakh and imprisonment up to 5 years.

When did the Construction and Demolition Waste Management Rules come into effect?

  1. March 29, 2016

  2. April 1, 2016

  3. May 1, 2016

  4. June 1, 2016


Correct Option: A
Explanation:

The Construction and Demolition Waste Management Rules came into effect on March 29, 2016.

Which ministry is responsible for formulating the Construction and Demolition Waste Management Rules, 2016?

  1. Ministry of Environment, Forest and Climate Change

  2. Ministry of Urban Development

  3. Ministry of Housing and Urban Affairs

  4. Ministry of Rural Development


Correct Option: A
Explanation:

The Ministry of Environment, Forest and Climate Change is responsible for formulating the Construction and Demolition Waste Management Rules, 2016.

What is the objective of the Construction and Demolition Waste Management Rules, 2016?

  1. To regulate the generation, storage, collection, transportation, processing, and disposal of construction and demolition waste

  2. To promote the use of recycled materials in construction

  3. To reduce the environmental impact of construction and demolition activities

  4. All of the above


Correct Option: D
Explanation:

The objective of the Construction and Demolition Waste Management Rules, 2016 is to regulate the generation, storage, collection, transportation, processing, and disposal of construction and demolition waste, promote the use of recycled materials in construction, and reduce the environmental impact of construction and demolition activities.

What is the definition of 'construction waste' as per the rules?

  1. Waste generated during the construction of any civil structure

  2. Waste generated during the alteration of any civil structure

  3. Waste generated during the demolition of any civil structure

  4. All of the above


Correct Option: D
Explanation:

Construction waste includes waste generated during the construction, alteration, or demolition of any civil structure.

What is the definition of 'demolition waste' as per the rules?

  1. Waste generated during the demolition of any civil structure

  2. Waste generated during the excavation of earth or rock

  3. Waste generated during the processing of construction materials

  4. None of the above


Correct Option: A
Explanation:

Demolition waste is waste generated during the demolition of any civil structure.

What are the responsibilities of the project proponent for managing construction and demolition waste?

  1. To prepare a waste management plan

  2. To obtain authorization from the concerned authority

  3. To ensure proper storage and disposal of waste

  4. All of the above


Correct Option: D
Explanation:

The project proponent is responsible for preparing a waste management plan, obtaining authorization from the concerned authority, and ensuring proper storage and disposal of waste.

What are the requirements for the storage of construction and demolition waste?

  1. Waste must be stored in designated areas

  2. Waste must be covered to prevent dust and odor

  3. Waste must be stored in a manner that does not pose a hazard to human health or the environment

  4. All of the above


Correct Option: D
Explanation:

Construction and demolition waste must be stored in designated areas, covered to prevent dust and odor, and stored in a manner that does not pose a hazard to human health or the environment.

What are the methods of disposal of construction and demolition waste as per the rules?

  1. Landfilling

  2. Incineration

  3. Recycling

  4. All of the above


Correct Option: D
Explanation:

Construction and demolition waste can be disposed of by landfilling, incineration, recycling, or a combination of these methods.