0

architecture Online Quiz - 3

Description: architecture Online Quiz - 3
Number of Questions: 20
Created by:
Tags: architecture
Attempted 0/20 Correct 0 Score 0

Which of these is not a Datapower box?

  1. XI50

  2. XS40

  3. XB60

  4. XN10


Correct Option: D

Datapower can expose Legacy systems as Web services: State True or Flase

  1. True

  2. False


Correct Option: B

What are the protocol transformations that datapower support?

  1. MQ – HTTP

  2. HTTP – HTPPS

  3. FTP – MQ

  4. All of the above


Correct Option: D

Datapower can work as XML accelerator: State True or Flase

  1. True

  2. False


Correct Option: B

What are the security standards supported by Datapower?

  1. WS-Policy

  2. Protection against DOS attacks

  3. SQL injection Attacks

  4. All of the above


Correct Option: D

Datapower can integrate with service registries: State True of False

  1. True

  2. False


Correct Option: B

How are transformation done in Datapower?

  1. Using Java

  2. Using C

  3. Using C++

  4. XSLT


Correct Option: D

Which of the following are the benefits of clustering?

  1. High availability

  2. workload management

  3. a & b both

  4. synchronous messaging


Correct Option: C

What are the transformation supported by Datapower?

  1. EDI

  2. COBOL Copy book

  3. CSV

  4. All of the above


Correct Option: D

From the list below , which is not a feature of MQ ?

  1. Assured message delivery

  2. transform message format

  3. Asynchronous messaging

  4. Platform independence


Correct Option: B

Is this statement true or false ? - MQ message has a data part and a descriptor part

  1. True

  2. False

  3. None of the above

  4. Don't Know


Correct Option: A

Which of the following are the capabilities of Message Broker?

  1. Message transformation and enrichment

  2. Message Routing

  3. Publish/Subscribe

  4. All of the above


Correct Option: D

What does DMZ stands for ?

  1. Domain Message Zone

  2. De-Militarized Zone

  3. Domain Name Service

  4. Denial Of Service


Correct Option: B

A internet application has a target audience from within a specified geography, what monitoring is best suggested for the application

  1. monitoring from the same data center

  2. monitoring from nodes specific to the geography

  3. monitoring from nodes across the world

  4. All the above


Correct Option: B
  1. Remove the node and replace it with a healthy node

  2. Debug the node to see why the application fails from the specific node and fix the issue

  3. leave the nodes as it is.

  4. None of the above.


Correct Option: A

Using SCRUM methodology, the project progress in small iterations called

  1. BREAKS

  2. MODULES

  3. SPRINTS

  4. None of the above


Correct Option: C

The tool used in SCRUM to track the progress of work is called

  1. Burndown chart

  2. Flow chart

  3. Status report

  4. All of the above


Correct Option: A

The three roles in a SCRUM project are

  1. Team, SCRUM master, Project manager

  2. Customer, Project team, Project manager

  3. Product owner, SCRUM Master, Team

  4. Product owner, Project manager, team


Correct Option: C

AI Explanation

To answer this question, you need to have an understanding of the roles in a SCRUM project.

Option A) Team, SCRUM master, Project manager - This option is incorrect because the role of a project manager is not a defined role in SCRUM. SCRUM projects typically do not have a traditional project manager.

Option B) Customer, Project team, Project manager - This option is incorrect for the same reason as Option A. The role of a project manager is not a defined role in SCRUM.

Option C) Product owner, SCRUM Master, Team - This option is correct. In a SCRUM project, the Product Owner is responsible for defining and prioritizing the product backlog. The SCRUM Master is responsible for facilitating the SCRUM process and ensuring that the team adheres to the SCRUM principles and practices. The Team is responsible for delivering the product increments.

Option D) Product owner, Project manager, team - This option is incorrect because, as mentioned earlier, the role of a project manager is not a defined role in SCRUM.

The correct answer is C) Product owner, SCRUM Master, Team. This option is correct because it includes the three roles that are typically present in a SCRUM project.

Prioritised list of requirements in a SCRUM project is called

  1. Project log

  2. Product backlog

  3. Sprint backlog

  4. Business requirements document


Correct Option: B

The requirements selected from the product backlog into Sprint back log can not be changed in the middle of the SPRINT

  1. True

  2. False

  3. None

  4. Don't Know


Correct Option: A
- Hide questions