Wind Power Initiatives

Description: This quiz assesses your understanding of India's Wind Power Initiatives, a crucial component of the country's renewable energy strategy. Test your knowledge about wind energy projects, policies, and their impact on India's energy mix.
Number of Questions: 15
Created by:
Tags: wind power renewable energy energy initiatives sustainable development
Attempted 0/15 Correct 0 Score 0

Which Indian state is known as the 'Wind Power Capital of India'?

  1. Tamil Nadu

  2. Gujarat

  3. Karnataka

  4. Rajasthan


Correct Option: A
Explanation:

Tamil Nadu is renowned for its extensive wind power installations and has been a pioneer in wind energy development in India.

What is the primary objective of the National Wind-Solar Hybrid Policy?

  1. Promoting grid integration of wind and solar power

  2. Encouraging off-grid wind-solar systems

  3. Developing wind-solar parks

  4. Providing subsidies for wind-solar projects


Correct Option: A
Explanation:

The National Wind-Solar Hybrid Policy aims to integrate wind and solar power generation into the grid, optimizing energy utilization and improving grid stability.

Which government agency is responsible for promoting and regulating wind power development in India?

  1. Ministry of New and Renewable Energy (MNRE)

  2. Central Electricity Authority (CEA)

  3. Power Grid Corporation of India (PGCIL)

  4. National Institute of Wind Energy (NIWE)


Correct Option: A
Explanation:

The Ministry of New and Renewable Energy (MNRE) is the nodal agency responsible for formulating policies, programs, and incentives for wind power development in India.

What is the target set by the Indian government for wind power capacity by 2030?

  1. 60 GW

  2. 100 GW

  3. 150 GW

  4. 200 GW


Correct Option: B
Explanation:

The Indian government has set an ambitious target of achieving 100 GW of wind power capacity by 2030, contributing significantly to the country's renewable energy goals.

Which Indian state has the highest wind power potential?

  1. Gujarat

  2. Rajasthan

  3. Tamil Nadu

  4. Karnataka


Correct Option: A
Explanation:

Gujarat possesses the highest wind power potential in India due to its favorable geographical location and strong wind patterns.

What is the primary challenge faced by wind power projects in India?

  1. High capital costs

  2. Intermittency of wind

  3. Lack of grid infrastructure

  4. Environmental concerns


Correct Option: B
Explanation:

The intermittency of wind, its unpredictable nature, poses a significant challenge for wind power projects, affecting grid stability and requiring backup power sources.

Which Indian state has the largest wind farm?

  1. Tamil Nadu

  2. Gujarat

  3. Karnataka

  4. Rajasthan


Correct Option: A
Explanation:

Tamil Nadu is home to the largest wind farm in India, located in Muppandal, with a capacity of over 1,500 MW.

What is the name of India's first offshore wind power project?

  1. Gujarat Offshore Wind Farm

  2. Tamil Nadu Offshore Wind Farm

  3. Karnataka Offshore Wind Farm

  4. Andhra Pradesh Offshore Wind Farm


Correct Option: A
Explanation:

The Gujarat Offshore Wind Farm, located in the Gulf of Khambhat, is India's first offshore wind power project.

Which Indian state has the highest per capita wind power generation?

  1. Tamil Nadu

  2. Gujarat

  3. Karnataka

  4. Rajasthan


Correct Option: A
Explanation:

Tamil Nadu leads in per capita wind power generation in India, demonstrating its commitment to renewable energy and sustainable development.

What is the primary advantage of wind power over other renewable energy sources?

  1. High capacity factor

  2. Low maintenance costs

  3. Predictable generation

  4. Minimal environmental impact


Correct Option: A
Explanation:

Wind power has a high capacity factor compared to other renewable energy sources, meaning it can generate electricity more consistently and efficiently.

Which Indian state has the lowest wind power potential?

  1. West Bengal

  2. Odisha

  3. Andhra Pradesh

  4. Kerala


Correct Option: A
Explanation:

West Bengal has the lowest wind power potential among the mentioned states due to its geographical location and wind patterns.

What is the name of India's largest wind turbine manufacturer?

  1. Vestas India

  2. Suzlon Energy

  3. Gamesa India

  4. Siemens Gamesa Renewable Energy


Correct Option: B
Explanation:

Suzlon Energy is India's largest wind turbine manufacturer, playing a significant role in the country's wind power development.

Which Indian state has the highest wind power installed capacity?

  1. Tamil Nadu

  2. Gujarat

  3. Karnataka

  4. Rajasthan


Correct Option: A
Explanation:

Tamil Nadu has the highest wind power installed capacity in India, showcasing its leadership in renewable energy adoption.

What is the primary challenge faced by wind power projects in remote areas?

  1. Lack of grid infrastructure

  2. High transportation costs

  3. Environmental concerns

  4. Intermittency of wind


Correct Option: A
Explanation:

In remote areas, the lack of grid infrastructure poses a significant challenge for wind power projects, hindering their connectivity to the electricity grid.

Which Indian state has the highest wind power generation?

  1. Tamil Nadu

  2. Gujarat

  3. Karnataka

  4. Rajasthan


Correct Option: A
Explanation:

Tamil Nadu has the highest wind power generation in India, contributing significantly to the country's renewable energy output.

- Hide questions