Hydropower Initiatives

Description: Hydropower Initiatives Quiz
Number of Questions: 15
Created by:
Tags: hydropower renewable energy indian environment
Attempted 0/15 Correct 0 Score 0

Which state in India has the highest installed hydropower capacity?

  1. Uttarakhand

  2. Himachal Pradesh

  3. Arunachal Pradesh

  4. Sikkim


Correct Option: B
Explanation:

Himachal Pradesh has the highest installed hydropower capacity in India, with over 10,000 MW of installed capacity.

What is the largest hydropower project in India?

  1. Tehri Dam

  2. Nagarjuna Sagar Dam

  3. Bhakra Nangal Dam

  4. Hirakud Dam


Correct Option: A
Explanation:

Tehri Dam is the largest hydropower project in India, with an installed capacity of 2,400 MW.

Which type of hydropower plant uses the energy of moving water to generate electricity?

  1. Run-of-the-river

  2. Pumped-storage

  3. Impoundment

  4. Tidal


Correct Option: A
Explanation:

Run-of-the-river hydropower plants use the energy of moving water to generate electricity without the need for a dam or reservoir.

What is the primary advantage of pumped-storage hydropower plants?

  1. High efficiency

  2. Low cost

  3. Flexibility

  4. Environmental friendliness


Correct Option: C
Explanation:

Pumped-storage hydropower plants offer flexibility in electricity generation, allowing for the storage of excess energy during periods of low demand and its release during periods of high demand.

Which type of hydropower plant utilizes the rise and fall of tides to generate electricity?

  1. Run-of-the-river

  2. Pumped-storage

  3. Impoundment

  4. Tidal


Correct Option: D
Explanation:

Tidal hydropower plants harness the energy of the tides to generate electricity.

What is the main environmental concern associated with large-scale hydropower projects?

  1. Air pollution

  2. Water pollution

  3. Deforestation

  4. Habitat fragmentation


Correct Option: D
Explanation:

Large-scale hydropower projects can lead to habitat fragmentation, disrupting ecosystems and affecting biodiversity.

Which Indian state has the highest potential for hydropower generation?

  1. Uttarakhand

  2. Himachal Pradesh

  3. Arunachal Pradesh

  4. Sikkim


Correct Option: C
Explanation:

Arunachal Pradesh has the highest potential for hydropower generation in India, with an estimated potential of over 50,000 MW.

What is the main advantage of small-scale hydropower projects?

  1. High efficiency

  2. Low cost

  3. Minimal environmental impact

  4. Flexibility


Correct Option: C
Explanation:

Small-scale hydropower projects have a minimal environmental impact compared to large-scale projects, making them more sustainable.

Which type of hydropower plant utilizes a dam to create a reservoir of water?

  1. Run-of-the-river

  2. Pumped-storage

  3. Impoundment

  4. Tidal


Correct Option: C
Explanation:

Impoundment hydropower plants use a dam to create a reservoir of water, which is then released through turbines to generate electricity.

What is the primary challenge associated with the development of hydropower projects in India?

  1. High cost

  2. Environmental concerns

  3. Lack of technical expertise

  4. Political instability


Correct Option: B
Explanation:

Environmental concerns, such as habitat fragmentation and displacement of local communities, are the primary challenges associated with the development of hydropower projects in India.

Which Indian state has the lowest installed hydropower capacity?

  1. Uttarakhand

  2. Himachal Pradesh

  3. Arunachal Pradesh

  4. Sikkim


Correct Option: D
Explanation:

Sikkim has the lowest installed hydropower capacity in India, with less than 1,000 MW of installed capacity.

What is the primary advantage of tidal hydropower plants?

  1. High efficiency

  2. Low cost

  3. Predictability

  4. Minimal environmental impact


Correct Option: C
Explanation:

Tidal hydropower plants offer predictability in electricity generation, as the tides are predictable natural phenomena.

Which type of hydropower plant utilizes a series of reservoirs at different elevations?

  1. Run-of-the-river

  2. Pumped-storage

  3. Impoundment

  4. Cascade


Correct Option: D
Explanation:

Cascade hydropower plants utilize a series of reservoirs at different elevations to generate electricity.

What is the main disadvantage of pumped-storage hydropower plants?

  1. High cost

  2. Low efficiency

  3. Environmental impact

  4. Limited storage capacity


Correct Option: B
Explanation:

Pumped-storage hydropower plants have a lower efficiency compared to other types of hydropower plants due to energy losses during the pumping and generation processes.

Which Indian state has the second highest installed hydropower capacity?

  1. Uttarakhand

  2. Himachal Pradesh

  3. Arunachal Pradesh

  4. Sikkim


Correct Option: A
Explanation:

Uttarakhand has the second highest installed hydropower capacity in India, with over 9,000 MW of installed capacity.

- Hide questions