In prioritizing what to test, the most important objective is to:

  1. Find as many faults as possible

  2. Test high risk areas

  3. Test whatever is easiest to test

  4. Obtain good test coverage


Correct Option: B

IEEE 829 test plan documentation standard contains all of the following except

  1. Test tasks

  2. Test items

  3. Test deliverables

  4. Test specifications


Correct Option: D

Test cases are designed during:

  1. test recording

  2. test planning

  3. test configuration

  4. test specification


Correct Option: D

Which of the following is NOT included in the Test Plan document of the Test Documentation Standard?

  1. Quality plans

  2. What is not to be tested

  3. Schedules and deadlines

  4. Test environment properties


Correct Option: A

Which of the following is not described in a unit test standard?

  1. syntax testing

  2. equivalence partitioning

  3. stress testing

  4. modified condition/decision coverage


Correct Option: C

Enough testing has been performed when:

  1. time runs out

  2. the required level of confidence has been achieved

  3. no more faults are found

  4. the users won’t find any serious faults


Correct Option: B

AI Explanation

To answer this question, we need to understand the concept of testing in software development.

Option A) Time runs out - This option is incorrect. The completion of testing is not solely based on the passage of time. The testing process should continue until certain criteria are met.

Option B) The required level of confidence has been achieved - This option is correct. Testing is considered complete when the required level of confidence has been achieved. This level of confidence can be defined based on the project's requirements, industry standards, or specific testing goals.

Option C) No more faults are found - This option is incorrect. While finding and fixing faults is an important goal of testing, the absence of faults does not necessarily indicate that enough testing has been performed. There may still be undiscovered faults or scenarios that need to be tested.

Option D) The users won't find any serious faults - This option is incorrect. Relying solely on users to find faults is not a reliable approach to determine the completion of testing. It is important to proactively identify and address potential issues through systematic testing.

The correct answer is B) The required level of confidence has been achieved. This option is correct because it considers the achievement of the desired level of confidence as the criterion for completing testing.

Test managers should not:

  1. Sign the system off for release

  2. Report on deviations from the project plan

  3. Re-allocate resource to meet original plans

  4. Raise incidents on faults that they have found


Correct Option: C